KEY FIGURES

 

HYDROELECTRIC POWER PLANTS

The generation of HEPP in 2024 is 444.5 GWh

The 2024 year-end installed capacity of the HEPP group is 228.7 MW.

 

2024 2023 2022 2021 2020
Energy Generation 444,5 GWh 489,7 GWh 549,5 GWh 453 GWh  605,7 GWh
Installed Capacity 228,7 MW 228,7 MW 228,7 MW 235,7 MW 235,7 MW 

 

SOLAR POWER PLANTS

The generation of SPP power plants in 2024 is 196.8 GWh

The 2024 year-end installed capacity of the SPP group is 121.4 MW.

 

2024 2023 2022 2021 2020
Energy Generation 196,8 GWh 195,5 GWh 192,4 GWh 203,4 GWh  184,8 GWh
Installed Capacity 121,4 MW 121,4 MW 121,4 MW 121,4 MW 121,4 MW 

 

WIND POWER PLANTS and HYBRID SPP PROJECTS

The generation of WPP plants in 2024 is 958.9 GWh

The 2024 year-end installed capacity of the WPP group is 348.9 MW. As of December 2024, hybrid SPP started operation with installed capacity of 3.95 MW.

 

2024 2023 2022 2021 2020
Energy Generation 958,GWh 974,4 GWh 1.016,0 GWh 1049,5 GWh  976 GWh
Installed Capacity 348,9 MW 348,9 MW 348,9 MW 348,9 MW 348,9 MW 

As of end March 2025 6 hybrid SPP with a total installed capacity of 75 MW became operational. Total installed capacity of WPP and hybrid SPP reached 424 MW.