The generation of HEPP in 2024 is 444.5 GWh
The 2024 year-end installed capacity of the HEPP group is 228.7 MW.
2024 | 2023 | 2022 | 2021 | 2020 | |
Energy Generation | 444,5 GWh | 489,7 GWh | 549,5 GWh | 453 GWh | 605,7 GWh |
Installed Capacity | 228,7 MW | 228,7 MW | 228,7 MW | 235,7 MW | 235,7 MW |
The generation of SPP power plants in 2024 is 196.8 GWh
The 2024 year-end installed capacity of the SPP group is 121.4 MW.
2024 | 2023 | 2022 | 2021 | 2020 | |
Energy Generation | 196,8 GWh | 195,5 GWh | 192,4 GWh | 203,4 GWh | 184,8 GWh |
Installed Capacity | 121,4 MW | 121,4 MW | 121,4 MW | 121,4 MW | 121,4 MW |
The generation of WPP plants in 2024 is 958.9 GWh
The 2024 year-end installed capacity of the WPP group is 348.9 MW. As of December 2024, hybrid SPP started operation with installed capacity of 3.95 MW.
2024 | 2023 | 2022 | 2021 | 2020 | |
Energy Generation | 958,GWh | 974,4 GWh | 1.016,0 GWh | 1049,5 GWh | 976 GWh |
Installed Capacity | 348,9 MW | 348,9 MW | 348,9 MW | 348,9 MW | 348,9 MW |
As of end March 2025 6 hybrid SPP with a total installed capacity of 75 MW became operational. Total installed capacity of WPP and hybrid SPP reached 424 MW.