WPP ENERGY INVESTMENTS

Akfen Renewables’ wind projects with an installed capacity of 348.9 MWm are in operation.Akfen Renewable’s Wind Projects constitute 49.9% of the Company’s total installed capacity. In 2020, 2021 and 2022, the total generation was respectively 976 GWh, 1,050 GWh and 1,015 GWh.

Akfen Renewables has 7 wholly owned subsidiaries that operate Wind Power Plants: İmbat, Derbent, Isıder, Korda, Kovancı, Kanat and Pruva.

WPP facilities are covered by insurance policies, including extended machine breakdown insurance, loss of profit, third party liability and employer liability insurance.

 

WPPs Operated by Imbat

1. Saritepe WPP

Sarıtepe WPP, located in Osmaniye and put into operation on 17.06.2016, has an installed capacity of 57 MWm/50 MWe.  Sarıtepe WPP has been included in the assets of the Company on 05.02.2020 through the acquisition method.  The electricity produced by this power plant is sold within the scope of FIT. Sarıtepe WPP will continue to benefit from FIT until 31.12.2026.

Production license for Sarıtepe WPP on behalf of İmbat was given on 11.06.2020 and is valid until 08.05.2057.

2. Demirciler WPP

Demirciler WPP, located in Osmaniye and put into operation on 22.07.2016, has an installed capacity of 23,3 MWm/23,3 MWe.  Demirciler WPP has been included in the assets of the Company on 05.02.2020 through the acquisition method.  The electricity produced by this power plant is sold within the scope of FIT. Sarıtepe WPP will continue to benefit from FIT until 31.12.2026.

Production license for Demirciler WPP on behalf of İmbat was given on 11.06.2020 and is valid until 15.07.2059.

 

WPPs Operated by ISIDER

Kocalar WPP

Kocalar WPP, located in Çanakkale province and commissioned on 14.03.2019, has an installed capacity of 30.6 MWm/26 MWe.  The electricity produced by this power plant is sold within the scope of FIT.  Kocalar WPP will continue to benefit from FIT until 31.12.2029.

The production license for Kocalar WPP was granted on 22.12.2011 and is valid until 22.12.2060.

 

WPPs Operated by DERBENT

Üçpınar WPP

Üçpınar WPP, located in Çanakkale province and commissioned on 11.05.2019, has an installed capacity of 112,2 MWm/ 99 MWe.  The electricity produced by this power plant is sold within the scope of FIT.  Üçpınar WPP will continue to benefit from FIT until 31.12.2029.

The production license for Üçpınar WPP was granted on 29.09.2011 and is valid until 29.09.2060.

 

WPPs Operated by KOVANCI

Hasanoba WPP

Hasanoba WPP, located in Çanakkale province and commissioned on 02.08.2019, has an installed capacity of 51 MWm/ 51 MWe.  The electricity produced by this power plant is sold within the scope of FIT.  Hasanoba WPP will continue to benefit from FIT until 31.12.2029.

The production license for Hasanoba WPP was granted on 01.03.2012 and is valid until 01.03.2061.

 

WPPs Operated by KORDA

Denizli WPP

Denizli WPP, located in Denizli and Aydın provinces and commissioned on 13.09.2019, has an installed capacity of 74,8 MWm/ 66 MWe.  The electricity produced by this power plant is sold within the scope of FIT.  Denizli WPP will continue to benefit from FIT until 31.12.2029.

The production license for Denizli WPP was granted on 18.08.2011 and is valid until 18.08.2060.

 

Other Disclosures Regarding WPP

Some technical features of turbines of wind power plants are as follows:

 

Technical
Properties
Üçpınar
WPP
Kocalar
WPP
Denizli
WPP
Hasanoba
WPP
Demirciler
WPP
Sarıtepe
WPP
Turbine Producer Siemens Gamesa Siemens Gamesa Siemens Gamesa Siemens Gamesa General Elektrik General Elektrik
Turbine Model SWT-3.4-108 SWT-3.4-108 SWT-3.4-108 SWT-3.4-108 GE 2.85 103 / GE 1.7 103 GE 2.85 103
Turbine Class IEC Class IA IEC Class IA IEC Class IA IEC Class IA IEC Class S IEC Class S
Number of Turbines 33 (3,4*33) 9 (3,4*9) 22 (3,4*22) 15 (3,4*15) 11 (2,85*4 + 7*1,7) 20 (2,85*20)
Hub Height (m) 80 80 80 80 80 (GE 1,7) / 85 (GE 2,85) 85
Rotor Diameter (m) 108 108 108 108 103 103

 

There are ongoing applications for capacity increase of 93.6 MWm/ 92.4 MWe of WPP Projects.  These Power Plants are Üçpınar WPP, Kocalar WPP, Hasanoba WPP, Sarıtepe WPP and Denizli WPP.  The installed power applied for each WPP is respectively 9.6 MWe, 25 MWe, 25 MWe, 7.8 MWe, 25 MWe.

A total of 90.26 MWe Solar hybrid investments are made by constructing SPPs within 6 different WPPs.

 

Hybrid SPP Investments

Akfen YenilenebIlir Enerji has applied for solar power plants as auxiliary resources for six licensed wind projects (Üçpınar, Hasanoba, Denizli, Kocalar, Sarıtepe, and Demirciler WPP) and one hydroelectric power plant project (Doğançay HEPP). The total hybrid capacity applied for is 94.81 MW. Our applications have been deemed appropriate by TEİAŞ and EPDK, and the requested capacities have been incorporated into our licenses.

In February 2024, the investment process was initiated for our hybrid solar power plant (SPP) projects with a total installed capacity of 66.25 MW, including Üçpınar SPP (40.02 MW), Sarıtepe SPP (12.97 MW), and Demirciler SPP (13.26 MW). Similarly, in April 2024, the investment process commenced for our hybrid SPP projects with a total installed capacity of 20 MW, including Denizli SPP (6.37 MW), Kocalar SPP (4.96 MW), and Hasanoba SPP (8.4 MW). The tender process for the turnkey construction of these projects has been completed. Construction contracts have been signed with the selected contractors, and the construction phases have begun.

The first phase of the Sarıtepe Hybrid Solar Power Plant (SPP) Project, with an installed capacity of 3.95 MW, under our subsidiary İmbat Enerji A.Ş. in Osmaniye province (license number EÜ/9381-16/04536 granted by the Energy Market Regulatory Authority), was provisionally accepted by the Turkish Ministry of Energy on December 26, 2024, in accordance with the regulations and has commenced commercial energy production.